After Saturday’s saga, it now looks as if the track has been restored. Today promises to be interesting as the flat car is removed from the bank and the excavator is removed from the Lake.
At 9:30 pm Saturday, work continued into the evening. Objective: to get the locomotive on the rails, to removed it, and to repair the track. Sunday morning’s picture is below.
At 7:30 am Sunday. In the high-resolution version of this picture, the track looks as if it has been repaired.
Great photos of the train wreck. I’m glad it did not hit ” Nude Rock”
Lois, chuckle, I had the same thought. Yet, that would have made for some interesting headlines: excavator goes swimming at nude rock while sidecar watches from the bank; prudish mountain covers nude rock with rock slide.